Survey Plan
Subaru Advisor Commmittee approved our 300 nights proposal over 5 years.Collaborators
We now have more than 200 CoI.
Fields
We will also plan to obtain broad-band images in grizy 5 band on the All-wavelength Extended Groth Strip (AEGIS) field (RA = 14h17m, Dec = +52°30′ to calibrate photometric redshift. It would be single poiting and 1 hour exposure on each band.
Depth
Expected limiting magnitude is shown above.Public Data Release
The HSC-SSP data will be open to the public every two years after the first release.
The second public data release (PDR2) of HSC-SSP occurred in May 2019.
The release includes over 300 square degrees of deep multi-color data served through dedicated databases and user interfaces.
The third PDR (PDR3) is planned in August 2021.
The final data release is going to be PDR4.
| Current schedule (as of July 2021) | |
|---|---|
| Public Data Release 1 | Released in February 2017 |
| Public Data Release 2 | Released in May 2019 |
| Public Data Release 3 | Planned in August 2021 |
| Public Data Release 4 (final release) | TBD |



