Facility related to the re-aluminzation

(Last updated July 2003)

3 trolleys

5 stations at ESB (ESB: enclosure support building, ground floor of the enclosure)

2 stations at observation/telescope floor (~20 m above)

waste pit 23 ton (6000 gallon) capacity, emergency drench, eye shower

mirror handling fixture

80-ton crane

rigging device

@

PMWF: primary mirror washing fixture (giant dish washer)

PMHF: primary mirror handling fixture (mirror pickup)